12.07.15
FlexTech Alliance issued a Request for Proposals (RFP) for Thin Film Power Sources. The purpose of this focused solicitation is to fund one or more recipients or teams to deliver or develop a Thin Flexible Power Source (TFPS) as an engine for a Functional Electronic Print (FEP) device.
A thin flexible power source is needed to power the FEP device and, at present, TFPS’ are at TRL 3 or 4, and a Manufacturing Readiness Level (MRL) of 2. In this solicitation, the TFPS must move to TRL 7/MRL 4 and be integrated with the FEP device to form a viable product.
Only full proposal responses to the RFP will be accepted by the due date of Wednesday, Jan. 6, 2016, 5:00 p.m. PST. The RFP can be accessed by following this link.
A thin flexible power source is needed to power the FEP device and, at present, TFPS’ are at TRL 3 or 4, and a Manufacturing Readiness Level (MRL) of 2. In this solicitation, the TFPS must move to TRL 7/MRL 4 and be integrated with the FEP device to form a viable product.
Only full proposal responses to the RFP will be accepted by the due date of Wednesday, Jan. 6, 2016, 5:00 p.m. PST. The RFP can be accessed by following this link.